Russia
Central processing facility (CPF) at Barsukovske field and preliminary gas processing terminal (PGPT) at Upper-Purpeiske field
- main design solutions (MDS);
- project design;
- approval and expert appraisal.
(Employer Region Stroyinginiring, Moscow, RF)
|
|
Diesel oil extraction unit with a capacity of 50 kton/year at Vankor field of CJSC «Vankorneft»
- main design solutions (MDS);
- basic and detail engineering design;
- approval and expert appraisal.
(Employer Orgregionproekt, Moscow, RF)
|
|
Feasibility study of gas processing at Beryambinskoe field in places of its production and at the pilot operation stage (Employer Gastranzit, Moscow, RF) |