Ukraine
Technical re-equipment of the incineration plant "Energia KYIVENERGO" in Kiev. Installation of chemical cleaning of flue gases. |
|
Preparation of tender documentation in order to select equipment and engineering services supplier for LG isomerization section of Schebelynskiy GPP |
|
Development of Rudkovske gas field. Reconstruction of BCS Komarno |
|
Flare system of Schebelynskiy GPP |
|
Schebelynske GPP. hydrotreating unit |
|
Development of Bilche-Volytskogo gas field. BCS Derzhyv |
|
Development of Leventsovske GCF. Booster Compressor Station |
|
Development of East-Novoselovske GCF. Booster Compressor Station |
|
Development of West-Berezovske GCF. Gas lift compressor station |
|
Development of the second stage of Yulievske OGCF. Booster Compressor Station |
|
Development of Khrestysche GCF. Reconstruction of the BCB-1 of Khrestysche BCS |
|
Reconstruction of unit for electric desalting of mixture of gas condensate and oil of Schebelynskiy GPP |
|
Reconstruction of loading/unloading rack at Schebelinske GPP |
|
Reconstruction of Schebelynskiy GPP. Light gasoline isomerization plant |
|
Oil products Control and Metering System at the tank field of Schebelynskiy GPP |
|
Development of gas-condensate well №102 of Mekhedovsko-Golotovschynske field |
|
Yablunivske GPP:
- Compressor’s exhaust gases heat recovery unit SM 11.01 cm Raw gas for propylene column;
- A system of separate fuel gas feed into the starters of "Solar" turbine units;
- Raw gas cooling unit
|