Ukrainian (UA)English (United Kingdom)Русский (Russian Federation)

Ukraine

energyz-d2

Technical re-equipment of the incineration plant "Energia KYIVENERGO" in Kiev. Installation of chemical cleaning of flue gases.

image001

Preparation of tender documentation in order to select equipment and engineering services supplier for LG isomerization section of Schebelynskiy GPP

image002

Development of Rudkovske gas field. Reconstruction of BCS Komarno

image010

 

 

Flare system of Schebelynskiy GPP

1proekt

 

Schebelynske GPP. hydrotreating unit

image003

Development of Bilche-Volytskogo gas field. BCS Derzhyv

image005

 

Development of Leventsovske GCF. Booster Compressor Station

image006

 

Development of East-Novoselovske GCF. Booster Compressor Station

image007

 

Development of West-Berezovske GCF. Gas lift compressor station

image008

Development of the second stage of Yulievske OGCF. Booster Compressor Station

image009

Development of Khrestysche GCF. Reconstruction of the BCB-1 of Khrestysche BCS

image011

 

Reconstruction of unit for electric desalting of mixture of gas condensate and oil of Schebelynskiy GPP

image012

 

Reconstruction of loading/unloading rack at Schebelinske GPP

image013

 

Reconstruction of Schebelynskiy GPP. Light gasoline isomerization plant

image015

 

 

Oil products Control and Metering System at the tank field of Schebelynskiy GPP

image016

 

Development of gas-condensate well №102 of  Mekhedovsko-Golotovschynske field

image017
Yablunivske GPP:
     - Compressor’s exhaust gases heat recovery unit SM 11.01 cm Raw gas for propylene column;
     - A system of separate fuel gas feed into the starters of "Solar" turbine units;
     - Raw gas cooling unit