Ukrainian (UA)English (United Kingdom)Русский (Russian Federation)

Turkmenistan


Reconstruction of the liquefied gas tank storage (LGTS) at Naip field including construction of 6000 m3 storage:
     - preparation of tender documentation;
     - front-end engineering and design;
     - basic and detail engineering design.
(Employer Orgregionproekt, Moscow, RF)

Reconstruction of the liquefied gas storage and handling facility in village Gazodzhak:
     - preparation of tender documentation;
     - front-end engineering and design;
     - basic and detail engineering design.
(Employer Orgregionproekt, Moscow, RF)

image019

Retrofitting of existing central processing facility (CPF) with  modular turbo expanding assembly and construction of booster compressor station (BCS) with compressor units MAN TURBO at Korpedzh field:
     - preparation of tender documentation;
     - front-end engineering and design;
     - basic engineering design.
(Employer Turbo Team, Hungary)
Reconstruction of Gugurtli CPF , CPF automation and power supply system and construction of BCS:
     - preparation of tender documentation;
     - front-end engineering and design;
     - basic engineering design.
(Employer SOKAR-KPS, Azerbaijan)